Civil Defense approval is often the last step before a building can open, and delays here are costly. Preparation should start long before the inspector arrives.
Make sure approved drawings match what was installed. Any change made on site, such as a relocated sprinkler or an added detector, needs to be reflected in the as-built set.
Test everything yourself first. Fire pumps should be run and their performance recorded, alarm devices tested one by one, and cause-and-effect sequences demonstrated end to end.
Have the documentation ready: material approvals, test certificates, pump curves and the operation and maintenance manual. A complete, well-organised file shows the inspector the system was installed with care.