High temperatures speed up setting and evaporation, which increases the risk of cracking and weak surfaces. These five rules protect summer pours.
One: schedule large pours for early morning or night. Two: control the concrete temperature at delivery, using chilled water or ice in the mix where specified.
Three: keep forms, reinforcement and subgrade cool and damp before placing. Four: have enough crew and equipment to place and finish without delays.
Five: start curing as soon as finishing allows and keep it going for the specified period. Curing is the step most often cut short, and the one that most affects durability.