Value engineering is often mistaken for cost cutting. Done properly, it means delivering the same function at a lower lifetime cost.
The best opportunities appear early, while the design is still flexible: simpler structural grids, standardised MEP components, and equipment selected for running cost as well as purchase price.
Every proposal should state what changes, what it saves, and what effect it has on performance and maintenance. If a saving shifts cost to the operator later, it is not value engineering.
When contractor and designer review the drawings together before tender, savings of several percent are common, without anyone noticing a drop in quality.
